会议专题

Evaluation of an opening time in a circuit breaker with springs

  It is important to reduce the opening time of circuit breaker.The time can be improved by changing the length of latches and hard point of joints.In this study,the mechanism part of circuit breaker is newly assembled based on the previous study and compared the opening time of original mechanism and modified mechanism to verify the improvement of opening time.

circuit breaker opening time high-speed camera test

Chang-Gyu Yoon Jin-Seok Jang Chi-Young Ryu Jeong-Hyun Sohn Hyun-Woo Kim Byung-Tae Bae Wan-Suk Yoo

School of Mechanical Engineering,Pusan National University,Busan 609-735,Korea Department of Mechanical Engineering,Pukyung National University,Busan 608-737,Korea Switchgear Research Team,Hyosung Corporation,Changwon 641-712,Korea Faculty of Mechanical Engineering,Pusan National University,Busan 609-735,Korea

国际会议

The 3th IFToMM Asian Conference on Mechanism and Machine Science 2014 International Conference on Mechanism and Machine Science,2014(第三届IFTOMM亚洲机构与机器科学会议暨2014海峡两岸机构学学术会议)

天津

英文

1-3