会议专题

Research on Vehicle Dispatching Problem in Open-Pit Coal Mine

  With the scale of open-pit coal mine production extends continuously,as well as the continuous improvement of equipment which is large-scale,mechanized and automatic degrees.The proportion of transportation cost by mining is higher and higher.Vehicle dispatching in open-pit coal mine production refers to a wide range of factors.The relevant information of the problem is revealed to the production decision maker who make the determination of real-time scheduling of production planning and real-time control of production process.This paper combined with the actual situation of AnJiaLing open-pit coal mine,analyzed and identified the assumptions and constraints,established mathematical model of the minimum total traffic volume and the maximum value total output.

SHE LIU SHIJIE WANG HUIZHI REN

School of Mechanical Engineering,Shenyang University of Technology,Shenyang,110870,China

国际会议

2014 International Conference on Management and Engineering(CME 2014)(2014管理与工程国际会议)

上海

英文

1-5

2014-05-24(万方平台首次上网日期,不代表论文的发表时间)