会议专题

Optimal Quasi-Periodic Preventive Maintenance Policies for a Two-unit Series System with Dynamic Maintenance Plan

  Most research on preventive maintenance (PM) assumed that a PM interval is a fixed value.However,practical PM actions usually are affected by some internal and external random factors,which make the PM interval become a limited random value rather then a fixed value.Few of the existing research consider this situation for two-unit system in their models.In this paper,a quasiperiodic PM policy for one type of two-unit series system with a dynamic maintenance plan is proposed,in which PM for U1 is perfect whereas for U2 is imperfect,and the dynamic PM plan is executed in each implemented period,and PM activities are performed through competing results of the dynamic PM plan and a catastrophic failure of U2.The optimal implemented period of PM and PM number is obtained which minimizes the excepted cost per unit time of the system in long run.Finally,a numerical example is given to illustrate the proposed model.

Quasi-periodic preventive maintenance policy Implemented period Two-unit series system Dynamic preventive maintenance plan

Wenke Gao Zhisheng Zhang Zhiqiang Zhang Yifan Zhou

School of Mechanical Engineering, Southeast University, Nanjing 211189, China Locomotive Depot of Urumqi Railway Bureau, Korla 841000, China

国际会议

2013西安国际航空维修与管理学术会议

西安

英文

75-86

2013-11-25(万方平台首次上网日期,不代表论文的发表时间)