An Approach for Determining Activity Implementation Time in Multitask Flow Network Plan
Determining the specific construction time forms the important content of construction in multitask flow network plan.A general calculating approach of time parameters is proposed in the process of dealing with such problems by flow network planning,and their features are collected preparedly.Main critical impact parameters are picked up,and procedure waiting float and global critical activity are defined as well.Determination approaches of activity construction time with various project duration desires are proposed when work intensity is considered,and application of flow network planning is extended.Finally,an example is given to analyze and demonstrate that the approach is available.
Multitask Flow network planning Global critical activity Planned project duration (PPD) Work intensity
Xiaowei Guo Baogang Li Xiaoyan Qu Dengwu Ma
Naval Aeronautical and Astronautical University, Yantai 264001
国际会议
西安
英文
197-211
2013-11-25(万方平台首次上网日期,不代表论文的发表时间)