An Effective Tool of Technical Management in the Systems Development Programs
Technical Performance Measurement (TPM) is a successfully applied tool of technical management in the systems development programs.TPMs aims to provide an early warning of the adequacy of a design in satisfying selected critical technical parameter requirements.TPM helps the program managers to discover the problems before the achievement of the system.It monitors the progress of technical performance, serving as an input of technical risk analysis and tradeoff research.Practice of Systems Engineering Leading Indicators(SELI)issued by International Council on Systems Engineering(INCOSE) in recent years is the new development of TPM.
Technical Performance Measurement (TPM) Technical Performance Measures (TPMs) Systems Engineering Leading Indicators (SELI) Technical Management
SUN Jing-fen YUAN Jian-hua ZHAO Yan PU Hong-bo
Beijing Information and Control Institute,Beijing 100048,China
国际会议
2013 International Conference on Business Analytics and Management Science (2013商务分析与管理科学国际会议)
北京
英文
127-134
2013-11-23(万方平台首次上网日期,不代表论文的发表时间)