Methods and Practices of Cost Reduction for Open Deep-hole Bench Millisecond Tight Blasting

  In an open deep-hole bench millisecond tight blasting, drilling costs make up a large proportion of costs of earth work, which is the second most costly procedure after transporta tion.In this essay, open deep-hole bench millisecond tight blasting will be used as an example to propose concrete measures of improvement for blasting process and to introduce practical meth ods of charging and sealing in construction site into earth fiat work.These measures have been proved to be effective, that they can help control blasting costs, reduce blasting expenditures and bring enterprises economic benefits.

open deep-hole bench millisecond delay tight blasting cost control uncoupled charge

OUYANG Jianhua

China Railway Port and Channel Engineering Group Co.,Ltd.(CRPCEC),Guangzhou,Guangdong,510660,China

国际会议

The 7th International Conference on Explosives and Blasting(China-Japan-Korea)(ICEB2013)第七届炸药和爆破(中日韩)国际会议

珠海

英文

138-142

2013-11-22(万方平台首次上网日期,不代表论文的发表时间)