Evolution Mechanism of Spatial-Time Characteristics of High Arch Dam

  As a kind of shell structure with strict requirements on foundation, high concrete arch dam has remarkable spatial-time characteristics.To take the Xiaowan Project, which has a 294.5 m high arch dam, as an example, the factor of time is comprehensively introduced in the whole numerical analysis procedure in this paper.The dynamic input of the parameters concerning geometry, mechanics, thermal and permeability following the construction progress, as well as their dynamic coupling with actions, are studied in an intention to establish a four-dimensional (spatial-time) numerical simulation method for real world.The Digitized System of Xiaowan Arch Dam (DSXAD) is then formulated mainly based on the combination of the safety monitoring system, the four-dimensional spatial-time simulation method, and the engineering judgments, which may be applied to evaluate the evolution in the real working conditions of the arch dam during its construction period as well as service period.A series of difficult technical issues in the implementation of the Xiaowan arch dam project are successfully solved by the use of the DSXAD, through these practices important theoretical insights are achieved, which will provide a solid base for the further revision and improvement of related design codes, and will found a new milestone for the high arch dam construction in China.

arch dam spatial-time characteristics evolution mechanism Digitized System of Xiaowan Arch Dam (DSXAD)

Zou Lichun Chen Shenghong Wang Guojin Tang Xianliang

Hydrochina Kunming Engineering Corporation, Kunming,650051, China Wuhan University, Wuhan ,430072, China

国际会议

Hydropower 2013- CHINCOLD Annual Meeting & the 3rd International Symposium on Rockfill Dams (水电2013大会——中国大坝协会2013学术年会暨第三届堆石坝国际研讨会)

昆明

英文

84-100