Construction Techniques of Nuozhadu Core Rockfill Dam
The Nuozhadu tore rackfill dam was filled with gravel mixed with soil, by crossing pavement and vertical blending technology to complete the largest-scale filling.Using three grading pumping technology, constructing cushion concrete, addressed the high valleys, steep slope concrete construction problems.The detection method of compaction degree of gravel mixed with soil was optimized by the test of whole diameter of 600 mm material compaction.And the digital control technology was use to control the process of soil extraction, transportation, paving and rolling real time.This construction technology was used to guarantee the construction quality of the dam.
Huang Zongying Ning Zhanjing Pang Linxiang
The No.1 General Team of Armed Police Hydropower Troops Armed police kinds College