Design of High CFRD for Jiangpinghe Hydropower Station
Jiangpinghe dam is a 219m-high concrete face rockfill dam (CFRD).The dam site lies at a narrow valley with precipitous terrain and complex geological conditions.The material used to build the dam is moraine conglomerate, which is strong, hard and difficult to compact.The paper focuses on the dam structural design, filling indexes, compaction technology and parameters, stress and deformation analysis, deformation control measures, and foundation treatment.
Jiangpinghe Concrete face rockfill dam (CFRD) Project features Dam material characteristics Dam design Deformation control Unfavorable geological mass treatment