Study on Optimization of High Concrete Face Rockfill Dam Filling Procedure
In this paper, the influence of concrete faced rockfill dam (CFRD) filling procedure parameters, such as staged-filling height difference, super filling height, dam settlement in advance, etc.on deformation of concrete slab is studied by adopted Clough-Duncan interface model.The result shows the degree of separation between concrete slab and cushion layer has obvious difference with different filling procedure, and the optimization of dam staged-filling construction scheme is the effective measure to reduce and avoid the separation.Combining with CFRD filling procedure optimization research, particle swarm optimization model for high CFRD staged-filling design is set up.The heterogeneous particle swarm optimization algorithm is adopted to staged-filling plan construction optimization calculate for deformation control of high CFRD concrete slab.
high concrete faced rockfill dam dam filling procedure staged-filling plan slab stages,separation between concrete slab and cushion layer, super filling height, filling height difference step width pre-settlement time particle swarm algorithm model he
Li Shiqi Zhang Bingyin Wang Rencao Zhang Fayu Ceng Dairong
HydroChina Kunming Engineering Corporation, Kunming,650051, China Department of Hydraulic Engineering, Tsinghua University, Beijing, 100084, China School of Civil Engineering, Tianjin University,Tianjin,300072, China
国际会议
昆明
英文
390-399
2013-11-01(万方平台首次上网日期,不代表论文的发表时间)