会议专题

Study on Optimization of High Concrete Face Rockfill Dam Filling Procedure

  In this paper, the influence of concrete faced rockfill dam (CFRD) filling procedure parameters, such as staged-filling height difference, super filling height, dam settlement in advance, etc.on deformation of concrete slab is studied by adopted Clough-Duncan interface model.The result shows the degree of separation between concrete slab and cushion layer has obvious difference with different filling procedure, and the optimization of dam staged-filling construction scheme is the effective measure to reduce and avoid the separation.Combining with CFRD filling procedure optimization research, particle swarm optimization model for high CFRD staged-filling design is set up.The heterogeneous particle swarm optimization algorithm is adopted to staged-filling plan construction optimization calculate for deformation control of high CFRD concrete slab.

high concrete faced rockfill dam dam filling procedure staged-filling plan slab stages,separation between concrete slab and cushion layer, super filling height, filling height difference step width pre-settlement time particle swarm algorithm model he

Li Shiqi Zhang Bingyin Wang Rencao Zhang Fayu Ceng Dairong

HydroChina Kunming Engineering Corporation, Kunming,650051, China Department of Hydraulic Engineering, Tsinghua University, Beijing, 100084, China School of Civil Engineering, Tianjin University,Tianjin,300072, China

国际会议

Hydropower 2013- CHINCOLD Annual Meeting & the 3rd International Symposium on Rockfill Dams (水电2013大会——中国大坝协会2013学术年会暨第三届堆石坝国际研讨会)

昆明

英文

390-399

2013-11-01(万方平台首次上网日期,不代表论文的发表时间)