Analysis of Baoping Concrete Face Rockfill Dam Infiltrating Status in Early Storage Period

  The article focuses on Baoping Hydroelectric Power Station in the early storage phase of seepage for analysis.Seepage monitoring data shows that the overall seepage of the plate dam is small, and anti-seepage curtain and cover of damhassignificant effect.Most slab monitoring parts have stable pressure, but a few have abnormal piezometer measurements.Analysis shows that negligible leakage of the slabexists, and insufficient permeability exists in some cushion parts.In addition, as weirs far has not been put into use, which leads to lack of basic information in deformation of joints and cracks in the slab.It is suggested that it should be put into use soon.

CFRD safety monitoring seepage analysis safety assessment

Zeng Xingying Lu Zhengchao

China Institute of WaterResources and Hydropower Research,Structural Materials Institute, Beijing, 100038, China

国际会议

Hydropower 2013- CHINCOLD Annual Meeting & the 3rd International Symposium on Rockfill Dams (水电2013大会——中国大坝协会2013学术年会暨第三届堆石坝国际研讨会)

昆明

英文

512-518

2013-11-01(万方平台首次上网日期,不代表论文的发表时间)