Preliminary Study on the Piezometer Installation in Miaowei Geomembrane-core Rockfill Cofferdam

  Several cofferdam quality or safety accidents brought economic loss and caused negative influence.So cofferdam seepage design and monitoring have been brought to the forefront.Piezometer installation in cofferdam is always interfered by rapid construction such as leak prevention construction and cofferdam filling after closure.It is difficult to drill in the rockfill materials which maybe influence cofferdam schedule.Papers summarizes the construction experience about borehole and protection for piezometers in rockfill on the basis of the piezometers installation in the Miaowei geomembrane-core rockfill cofferdam.It analyses the monitoring data in the first flood season after closure and gives a preliminary evaluation on the cofferdam.Papers provides guidance for similar cofferdam construction and offers reference for instrument installation in rockfill dam.

geomembrane-core rockfill cofferdam piezometer installation construction time geological conditions

Zhang Yulong Ma Haizhong Zhang Pengju

Kunming Hydroelectric Investigation, Design & Research Institute of Hydrochina Corporation, Kunming Hydropower Co.Ltd Huaneng of Lancang River,Kunming,650214, China

国际会议

Hydropower 2013- CHINCOLD Annual Meeting & the 3rd International Symposium on Rockfill Dams (水电2013大会——中国大坝协会2013学术年会暨第三届堆石坝国际研讨会)

昆明

英文

519-523

2013-11-01(万方平台首次上网日期,不代表论文的发表时间)