会议专题

Management and Practice on Environmental Protection in Construction Period of Longkaikou Hydropower Station

  The system of Three simultaneities and the idea of Building a hydropower station, protecting an environment have been implemented in the environmental protection during the construction of Longkaikou Hydropower Station.In station construction, the mechanism, system, capital, measures, supervision, inspection, and acceptance of work are put in place.A series of environmental protection measures are taken to protect water, atmosphere, acoustic and ecological environments, and a new environmental protection practice is explored for the wastewater treatment in foundation pit.The environmental protection of station construction has achieved remarkable effects.

environment protection and management system measures construction period Longkaikou Hydropower Station

Hu Sibo Wang Yi Yin Xiang

Huaneng Longkaikou Hydropower Project Construction and Management Bureau, Heqing ,671505, China

国际会议

Hydropower 2013- CHINCOLD Annual Meeting & the 3rd International Symposium on Rockfill Dams (水电2013大会——中国大坝协会2013学术年会暨第三届堆石坝国际研讨会)

昆明

英文

621-628

2013-11-01(万方平台首次上网日期,不代表论文的发表时间)