会议专题

Informatization Situation and Challenges in Hydropower Project Construction Phase

  Digital, Intelligent and Networked is the new trend of industrialized world, which will also have a huge impact on the production and organization way of infrastructure sectors.Since the Three Gorges Project first introduced and promoted large-scale information management systems represented by TGPMS at the end of last century, China has made great strides in the irfformation technology application in the construction phase of hydropower projects in the past 20 years.Given the new international development trend, To build a centralized core data-sharing platform for coordinating a variety of software tools to be used in the whole project lifecycles covering the engineering design, construction and operational management, then to implement the integrated management and application of all kinds of information resources has become the overall objective of the industry informatization development in the next stage.However, in order to construct the project lifecycle information management platform, different parties in this industry need to get united to resolve the loss problem of technology, business, industry standards and codes.

Hydropower project construction phase lifecycle informatization

Peng Hun

Wuhan INS Engineering Technology Co.Ltd.,Wuhan ,430071, China

国际会议

Hydropower 2013- CHINCOLD Annual Meeting & the 3rd International Symposium on Rockfill Dams (水电2013大会——中国大坝协会2013学术年会暨第三届堆石坝国际研讨会)

昆明

英文

649-656

2013-11-01(万方平台首次上网日期,不代表论文的发表时间)