会议专题

Rolled Asphalt Concrete Construction Technology in Winter

  Combine hydropower asphalt core dam construction in Kushitayi Xinjiang.Rolled asphalt concrete construction in winter with the ratio of the research and application.Put forward the method of rolling asphah concrete construction in winter.Solved the problem of rolling asphalt concrete core wall construction period which is shorter in cold northern areas.

Rolled asphalt concrete core wall construction in winter technology

Liu Yijun Dang Xiaoqing He Pengfei

1st Engineering Company of Sinohydro Corporation Engineering Bureau 15 co.,ltd,Xian,712000

国际会议

Hydropower 2013- CHINCOLD Annual Meeting & the 3rd International Symposium on Rockfill Dams (水电2013大会——中国大坝协会2013学术年会暨第三届堆石坝国际研讨会)

昆明

英文

768-777

2013-11-01(万方平台首次上网日期,不代表论文的发表时间)