会议专题

Dynamic Features Analysis and Prevention of Debris Flow:A Case of Study of Chunyashu Gully

  Geological disasters of debris flow are easy to cause serious loss of life and property, so analyzing the formation conditions and dynamic characteristic parameters and putting forward comprehensive control project is of great significance.Taking Chunyashu Gully debris flow as an example, the three basic conditions of topographic, water and source of debris flow were discussed firstly.Then dynamic parameters, such as density, velocity and discharge of debris flow were calculated and the development trend of debris flow was analyzed.Finally, according to the control targets, the comprehensive prevention and control idea of integrated blocking, retaining with draining was put forward, and the prevention and control engineering including check dam, silt-trap dam, unilateral protection embankment and V-type drainage groove were designed.The above design idea of prevention and control engineering for Chunyashu Gully debris flow can give a reference to similar engineering.

Debris flow Formation conditions Dynamic parameters Prevention engineering

YUAN Ying ZHOU Aihong ZHANG Hailiang

School of Prospecting Technology& Engineering,Shijiazhuang University of Economics,Shijiazhuang,0500 Hydrological and Engineering Geology Investigation Institute,Geology and Mineral Exploration Bureau

国际会议

第十八届凯洛林国际地质学术研讨会(The 18th Kerulien International Conference on Geological)

石家庄

英文

799-804

2013-09-20(万方平台首次上网日期,不代表论文的发表时间)