Risk Analysis And Management Of Track Construction On Running Railway Line Of High Speed Railway For PDL
Along with the large-scale construction of the high speed railway for PDL, track construction on running railway line of high speed railway for PDL become more and more.Compared with the ordinary railways construction safety management, the track construction on running railway line of PDL has its own characteristics.This essay starts from the analysis of these characteristics, next identity risk of track construction on running railway line of high speed railway for PDL, then establish the hierarchy analysis model, and use the analytic hierarchy process (AHP) for risk assessment.Last, put forward countermeasures and suggestions based on the evaluation results.
Running railway line Track construction PDL Security risk AHP
Zhao Teng Liu Xin Yang Wenqi
Graduate Academy of Southwest Jiaotong University,Sichuan,Chengdu,610031,China
国际会议
2013 2nd International Conference on Science and Social Research (2013年第二届科学与社会研究国际会议)(ICSSR2013)
北京
英文
245-249
2013-07-13(万方平台首次上网日期,不代表论文的发表时间)