会议专题

Full hydraulic and control systems application in open-cut mine Drill

  The LWD-200B full hydraulic open cut mine drills hydraulic system uses a variable displacement pump with load sensing constant power, load sensitive electromagnetic proportional multi-way directional valve, high torque hydraulic motor overhead direct drive rotary head, a long stroke hydraulic cylinder and steel wire rope and pulley speed lifting system, hydraulic cylinder to drive the unloading rod mechanism, hydraulic motor driving crawler, double hydraulic cylinder lifting the drill frame mechanism, a hydraulic motor driven cable winding drum, hydraulic legs leveling method.Control system adopts the control handle and the PLC control mode, with real-time data acquisition, computer automatic recognition of lithology and closed loop feedback control and GPS precise positioning function, to achieving the automatic or manual drilling, specified depth or level drilling.Through the test of practice, it is a multifunctional, fully hydraulic, which is intelligent and efficient perforation equipment.

Open cut mine drill Full hydraulic Load sensing Closed-loop feedback control Automatic drilling

Zhang Jiping Han Xinping Ma shijin Zhangjingcheng

Liaoning Technical University, College of Applied Science and Technology, Fuxin, Liaoning, China Liaoning Technical University, Institute of open pit mine, Fuxin, Liaoning, China Hebei University of Engineering, School of Civil Engineering, Handan, Hebei, China Fuxin Technology Supervision Bureau, Fuxin, Liaoning, China

国际会议

2013 International Conference on Machinery,Materials Science and Energy Engineering(2013机械、材料科学与能源工程国际会议)(ICMMSEE2013)

湖北荆州

英文

91-95

2013-05-18(万方平台首次上网日期,不代表论文的发表时间)