A Fault Analysis of Low Voltage Winding Disconnection of Transformer
Combined with an on-site trip action of heavy gas protection of a 220kv transformer,the routine and diagnostic test is done and through the analysis of the test result,the fault position is found correctly and the fault part is returned in time to the factory to do the disintegration confirmation to find out the fault reason and put forward the improvement measures of such fault.
transformer low voltage winding disconnection analysis improvement measure
Shengtao Sun Xiaodong Gao Richang Xian Wei Zhang
Zibo Power Supply
国际会议
上海
英文
1-4
2012-09-05(万方平台首次上网日期,不代表论文的发表时间)