会议专题

Selection of Working Fluids for Organic Rankine Cycle (ORC) in Waste Heat Power Generation System

  Selection of working fluid is crucial in designing an ORC system.A selection process to get potential pure working fluids for medium-temperature ORC processes has been investigated.Stability,safety and environmental aspects were considered firstly.Then vapor specific volume,latent heat,normal boiling point and critical point of refrigerants and non-refrigerating fluids are analyzed and net power output and cycle efficiency of the ORC system were calculated.Finally,17 pure fluids were selected for the heat sources of 420 K,470 K and 520 K respectively.The results indicated that refrigerants such as R245fa,R245ca and R365mfc are good enough for recovering waste heat of temperature ranged from 350K to 520K and the optimal turbine inlet pressure was ranged from 1.0 to 1.5MPa.

ORC waste heat working fluids refrigerant

X.Y.Huang H.Y.Wang Z.Wu T.Zhu J.Z.Wu

College of Mechanical Engineering Tongji University Shanghai, China

国际会议

2013 可再生能源与环境材料国际会议

成都

英文

1155-1160

2013-08-01(万方平台首次上网日期,不代表论文的发表时间)