Research on Template Concrete Board Security of Early Removal Connection Attached Support-System
The template support-system projects not only need to complete the range of quality optimization in one construction work,but also to make one of the sound security work.Installation and removal of template support-system are the largest amount of labor.To seek the template works rationalization and reduce the cost of the template works,it is an important way to save a lot of labor and reduce the cost of concrete structure.Therefore,how to improve the template engineering design and its production,installation,operation and removal efficacy effectively and make further reform of the template project for improving the quality of the project are of great significance in the construction of civilization.
Template support-system Concrete board Early strength of concrete Most adversely model
Fulong Zhao Yong Tian Qingping Li Xiaoli Wang
Guizhou construction science Research & Design Institute limited company of CSCEC,Guizhou Guiyang,550006,China
国际会议
西安
英文
438-441
2013-07-27(万方平台首次上网日期,不代表论文的发表时间)