Influence Analysis of the Incorrect Construction Sequence on Concrete Strength of Cast-in-place Piles

  The core drilling method is used for testing the concrete strength of the cast-in-place piles during the construction of a power plant.The concrete strength of some cast-in-place piles is far lower than the normal expected value.The incorrect construction sequence is the main cause of the quality problem.It is inadvisable to shorten the time limit for a project while ignoring the project quality.The more time will be spent to solve the quality problem of the project after the construction is complete.The construction organization is important for the quality of the projects and the reasonable construction sequence can improve the project quality.

construction sequence cast-in-place pile concrete strength core drilling method

Zhaoqing Zhua Jianxun Wang Zixia Feng

China Electric Power Research Institute,Beijing,100055,China

国际会议

2013 International Conference on Advanced Engineering Materials and Architecture Sciences(2013先进工程材料与建筑科学国际会议)(ICAEMAS 2013)

西安

英文

636-639

2013-07-27(万方平台首次上网日期,不代表论文的发表时间)