会议专题

The Technique for Simulation of Broken Defects In Model Pile Tests

  When carrying on laboratory experimental studies on broken piles,the test results depend on the technique used in simulating the model piles.Based on laboratory model tests,a complete set of making process of broken piles used in the study of the working behavior and mechanism of broken piles was presented in detail.The techniques include the pore-forming process and the simulation of the broken defects.The load vs.settlement curves for the vertically loaded broken piles obtained through the model pile tests were adopted and demonstrated the feasibility of the production process.

broken piles defect laboratory experiment technique production process

Chenghua Wang Chenglin Zhang Gan Wang Juan Su

School of Civil Engineering,Tianjin University,Tianjin 300072,China Xiamen fengda Architecture Design Institute,Xiamen,Fujian 361000,China Tianjin University Research Institute of Architectural Design,Tianjin 300073,China

国际会议

2013 International Conference on Advanced Engineering Materials and Architecture Sciences(2013先进工程材料与建筑科学国际会议)(ICAEMAS 2013)

西安

英文

640-644

2013-07-27(万方平台首次上网日期,不代表论文的发表时间)