Application of the CRD Method in Construction of an Ultra-Shallow,Ultra-High Section and Large-Span Mined Tunnel

  This paper explain the controllable factors of the application of the CRD method in the construction of an ultra-shallow,ultra-high section and large-span mined tunnel.And it also introduce the construction scheme of the application on the background of the Ou-Zhuang station air duct C of Guangzhou Metro line No.5.The practical application shows that the CRD method is not only an applicable method but also a necessary means for this kind of tunnel.

Ultra-shallow tunnel Ultra-high section and large-span mined tunnel CRD construction method

SU Jian-feng XU Yu-feng

Guangzhou Metro co.,Guangzhou 510030,China School of Civil Engineering and Transportation,South China University of Technology,Guangzhou 510640

国际会议

2013 International Conference on Advanced Engineering Materials and Architecture Sciences(2013先进工程材料与建筑科学国际会议)(ICAEMAS 2013)

西安

英文

680-683

2013-07-27(万方平台首次上网日期,不代表论文的发表时间)