Application of the CRD Method in Construction of an Ultra-Shallow,Ultra-High Section and Large-Span Mined Tunnel
This paper explain the controllable factors of the application of the CRD method in the construction of an ultra-shallow,ultra-high section and large-span mined tunnel.And it also introduce the construction scheme of the application on the background of the Ou-Zhuang station air duct C of Guangzhou Metro line No.5.The practical application shows that the CRD method is not only an applicable method but also a necessary means for this kind of tunnel.
Ultra-shallow tunnel Ultra-high section and large-span mined tunnel CRD construction method
SU Jian-feng XU Yu-feng
Guangzhou Metro co.,Guangzhou 510030,China School of Civil Engineering and Transportation,South China University of Technology,Guangzhou 510640