Analysis of Stability of Sloping Base Inner Dump during Transition Alternative of Mining Area in AJL Surface Coal Mine
This paper is based on the Luzigou anticline geological structure encountered in the process of inside dump which caused a big range of falling of basement and had a serious effect on row abandon plans in Anjialing surface mine.The authors analyzed the internal force,displacement,the plastic zone and other relevant circumstances,calculated correlative coefficient of stability,made a comprehensive evaluation of dumping process.Based on this,the paper came up with a project implementation of transition alternative mode plan from Z shaped work line to L shaped work line engineering and technical solution which could improve the security situation in the dump,make sure the inner dump slope stability.Selected the ways of dump plan dumping arrangement.
internal dumping in sloping base stripe stability numerical simulation engineering measures
Cao Bo Liu Guangwei Wang Xiaoguang Li Yanfei Gao Yu Li Qiang
College of Mining, Liaoning Technology University, Fuxin, 123000, China Shenhuabaorixile Energy Industral Co.Ltd., Hailaer , 021000, China Zhaluteqizhahanaoer Energy Co.Ltd., Zhaluteqi , 029100, China
国际会议
International Symposium on Rock Mechanics and Mine Dynamic Disaster Prevention(岩石力学与矿井动力灾害防治国际学术研讨会)
辽宁阜新
英文
204-209
2013-07-13(万方平台首次上网日期,不代表论文的发表时间)