Start-up operation of anaerobic degradation process for palm oil mill effluent in anaerobic bench scale reactor (ABSR)

  The start-up operation or acclimatization process of anaerobic stabilization pond treatment for palm oil mill effluent (POME) was carried out in a laboratory anaerobic bench scale reactor (ABSR).The start-up operation of the ABSR was operated at two different organic loading rates (ORG) of 0.89-0.92 kg COD/m3/day and 1.34-1.37 kg COD/m3/day which corresponds to hydraulic retention time (HRT) of 60 and 40 days.The investigation showed that the acclimatize process for anaerobic degradation of POME was completed after 48 days of operation.In present study,the indicators that been used were pH,microbial growth,effluent of total chemical oxygen demand (COD),COD removal efficiency,alkalinity and ratio fraction between volatile fatty acid and alkalinity.

Anaerobic degradation Acclimatization phase Palm Oil Mill Effluent Chemical oxygen demand Volatile fatty acid

Tjoon Tow Teng Yee-Shian Wong Soon-An Ong M.Norhashimah M.Rafatullah

School of Industrial Technology, Universiti Sains Malaysia, 11600 Gelugor, Pulau Pinang, Malaysia School of Industrial Technology, Universiti Sains Malaysia, 11600 Gelugor, Pulau Pinang, Malaysia;Sc School of Environmental Engineering, Universiti Malaysia Perlis, Kompleks Pusat Pengafian Jejawi 3,

国际会议

2013 International Symposium on Environmental Science and Technology(2013环境科学与技术国际会议)

大连

英文

355-361

2013-06-04(万方平台首次上网日期,不代表论文的发表时间)