会议专题

LONG-TERM BEHAVIOR OF METRO TUNNEL IN THE SOFT DEPOSIT OF SHANGHAI

  In order to investigate the long-term behavior of the metro tunnel in Shanghai,a large amount of field data is collected.It is observed that the shield tunnels in Shanghai have suffered serious post-construction settlement and substantial differential settlement.The settlement was very fast in the previous three years with a speed of 30 ~ 50mm in maximum,and then the speed slowed down.Besides,settlement of the tunnel has resulted in serious leakage of groundwater,which concentrated principally in the area of 30 ~ 50m from the working well or 20m from the connection passage.Causes of tunnel settlements are also discussed in this paper,including land subsidence,leakage of groundwater,dynamic response of train,nearby constructions,etc.

shield tunnel Shanghai metro long-term settlement soft deposit

HUAINA WU SHUILONG SHEN YESHUANG XU

Department of Civil Engineering,Shanghai Jiao Tong University and State Key Laboratory of Ocean Engineering,Shanghai 200240,China

国际会议

5th China-Japan Geotechnical Symposium(第五届中日岩土工程学术会议)

成都

英文

356-359

2013-05-18(万方平台首次上网日期,不代表论文的发表时间)