RESEARCH ON AUTO PART ASSEMBLY LINE BALANCING RATE MODEL AND ITS APPLICATION BASED ON WORK STUDY

  Based on work study of work station in the production line,the manufacturing resources rationality was analyzed including the equipment,personnel configuration,working station appliances in workshop.Firstly the bottleneck work process and its influencing factors is given based on measurement of work operation time.The time could be measured by the model law and the stopwatch.Then the production line process analysis,process time and motion analysis,the field distribution and layout analysis of manufacturing resources are made under simulation and optimization.According to the ECRS principle and the implementation procedures of production line balance,the effective improvement measures were put forward.The production efficiency of instrument production line of auto parts company is greatly improved through the application of operation content reconfiguration,tools and equipments improvement,the adjustment of workstation operating time and personnel and the strengthen scheduling.

assembly line balance bottleneck process standard time process reconstruction

WANG Zhi-guo GONG Ben-gang

School of management engineering, Anhui Polytechnic University, Wuhu Anhui 241000, China

国际会议

The 6th International Conference Design and Manufacture for Sustainable Development(第六届面向可持续发展的设计和制造国际会议(ICDMSD2013))

杭州

英文

121-129

2013-04-15(万方平台首次上网日期,不代表论文的发表时间)