RESEARCH ON AUTO PART ASSEMBLY LINE BALANCING RATE MODEL AND ITS APPLICATION BASED ON WORK STUDY
Based on work study of work station in the production line,the manufacturing resources rationality was analyzed including the equipment,personnel configuration,working station appliances in workshop.Firstly the bottleneck work process and its influencing factors is given based on measurement of work operation time.The time could be measured by the model law and the stopwatch.Then the production line process analysis,process time and motion analysis,the field distribution and layout analysis of manufacturing resources are made under simulation and optimization.According to the ECRS principle and the implementation procedures of production line balance,the effective improvement measures were put forward.The production efficiency of instrument production line of auto parts company is greatly improved through the application of operation content reconfiguration,tools and equipments improvement,the adjustment of workstation operating time and personnel and the strengthen scheduling.
assembly line balance bottleneck process standard time process reconstruction
WANG Zhi-guo GONG Ben-gang
School of management engineering, Anhui Polytechnic University, Wuhu Anhui 241000, China
国际会议
杭州
英文
121-129
2013-04-15(万方平台首次上网日期,不代表论文的发表时间)