会议专题

RECYCLING PROCESS FOR AUTOMOTIVE ELECTRONIC CONTROL COMPONENTS IN CHINA

  Chinas recycling roadmap and technology scheme for automotive electronic control components are investigated.The mathematical analysis model of the remanufacturing process is established on the basis of stochastic network technology,as well as on the graphical evaluation and review technique (GERT).In addition,the calculation method used for estimating single product remanufacturing time is examined.The objective of this study is to determine the probability of success for the remanufacturing of automotive electronic control components and remanufacturing time.On the basis of experimental parameters,we simulate the remanufacturing process by Monte Carlo simulation in Crystal Ball.Compared with the result of the GERT model (8.5114 h),the simulation error rate is 0.225%.This consistency in results indicates that both the stochastic network model and Crystal Ball can accurately simulate the remanufacturing process of used automotive electronic control components,making these techniques feasible approaches for such processes.Aside from numerical experiments on and sensitivity analyses of key processes,the relationship between total remanufacturing time and five influencing factors are identified.Total remanufacturing time can be significantly reduced by optimizing the key processes.The optimization methods are also investigated.

automotive electronic control components recycling stochastic network model Monte-Carlo simulation in crystal ball China

J.J.Wang M.Chen

School of Mechanical and Power Engineering, Shanghai Jiao Tong University, Shanghai, PR China

国际会议

The 6th International Conference Design and Manufacture for Sustainable Development(第六届面向可持续发展的设计和制造国际会议(ICDMSD2013))

杭州

英文

244-249

2013-04-15(万方平台首次上网日期,不代表论文的发表时间)