A Method for Generating the Timetable of Double-track Railway Line
Passenger and freight train scheduling problem on double-track railway line is considered by using Ant Colony Optimization (ACO) algorithm.The aim is to reasonably arrange the dispatch sequence of the trains to minimize the total run time.The constrains in train scheduling problem are considered and the model is established.Due to the complexity of train scheduling problem,this problem is solved by ACO and implemented by programming.A case study is presented to illustrate the solution.The results illustrate that the proposed method is effective to solve the scheduling problem on double-track railway line.
timetable double-track railway ACO
ZHANG Yan CUI Yanping YANG Wentao
Transportation and Economics Institute China Academy of Railway Sciences Beijing,China
国际会议
杭州
英文
2049-2052
2013-03-22(万方平台首次上网日期,不代表论文的发表时间)