会议专题

Stress Performance Analysis on New Type of Concrete-filled Steel Tube Pre-stressed Truss Continuous Beam Bridge

  This paper takes the construction of Gan Hai-zi concrete-filled steel tube pre-stressed continuous truss Beam Bridge as the engineering background.Combined with the actual construction process of the bridge,taken the main structure of the bridge as the typical prestressed composite structure and used the finite element joint section to simulation the whole construction process of the 35th and 36th experimental cross composite structure of the bridge.Theoretical analysis combined with the field test,and the calculation results are in good agreement with the experimental results,which shows that the construction mechanical performance of the new bridge structure is good.

concrete-filled steel tube truss Beam Bridge the joint section finite element construction mechanical performance

Xiao-hui YUAN Zhe-an LU

Hubei Key Laboratory of Roadway Bridge and Structural Engineering; Wuhan University of Technology; Wuhan 430070; China

国际会议

3rd International Conference on Frontiers of Manufacturing and Design Science(第三届制造与设计科学前沿国际会议(ICFMD))

香港

英文

1415-1420

2012-12-11(万方平台首次上网日期,不代表论文的发表时间)