会议专题

Multiple targets operation of reservoir group in flood-season in the Yangtze River

  China has built many reservoirs in the Yangtze River.Those reservoirs play an important role in flood control,electricity generation and shipping.But it is difficult to operation reservoir group reasonably because the comprehensive utilization demand.Especially in flood-season,there are usually many different targets to be considered.This paper researched the multiple targets operation of reservoir group in flood-season in the Yangtze River by multi-objective evaluation method.Three reservoir group operation schemes were selected to be compared.The results show that scheme three is the best scheme which has the highest evaluation value.The method this paper proposed is effective in comparing and selecting schemes in flood control management.

multiple targets reservoir group reservoir operation in flood-season the Yangtze River scheme evaluation

Li Anqiang He Xiaocong

Changjiang Institute of Survey, Planning, Design and Research Wuhan, China, 430010

国际会议

2012 2nd International Conference on Computer and Information Applications(ICCIA2012)(2012第二届计算机和信息应用国际会议)

太原

英文

1442-1445

2012-12-08(万方平台首次上网日期,不代表论文的发表时间)