15000 killed ducks for 10 hours production line cold item-engine rooms design

  This design is that 15000 killed ducks for 10 hours production line cold item-engine rooms design in LuoYang.Through the project design,construction and operation inspection,to explore the methods of cold storages coldly refrigeration system design and design principles.In this design,I proposed a cooling program to meet the higher latitude regions,which has a certain theoretical meaning and practical application value.

cold database design engine room design thermal calculation the refrigeration system