会议专题

Study on Construction Parameters of Cement Deep Mixing Piles

  Construction quality is one of the main reasons which lead to the failure of cement deep mixing pile.In order to ensure the construction quality of cement deep mixing pile and control its construction process, the influence of four construction parameters such as slurry conveying capacity, drilling and hoisting speed, agitation shaft rotation speed and remixing times on pile quality are analyzed.At last key reasons to ensure the construction quality of cement deep mixing pile are pointed out.Pile quality and construction efficiency should be considered when construction parameters being optimized.The research results provide reference for construction of cement deep mixing piles in the future.

Cement Deep Mixing Piles Construction Parameters Slurry Conveying Capacity Drilling and Hoisting Speed Agitation Shaft Rotation Speed Remixing Times

Wentao Rong

Shandong Transport Vocational College,China

国际会议

the 2012 International Conference on Vibration, Structural Engineering and Measurement (2012年振动、结构工程与测量国际会议(ICVSEM2012))

上海

英文

1386-1389

2012-10-19(万方平台首次上网日期,不代表论文的发表时间)