Monitoring of Large Section Tunnel crossing Qiantang River during Operation Period

  The foreign precision monitoring equipment was used for long term health monitoring in the large diameter tunnel of Hangzhou Qingchun-road.Based on field monitoring data, the force and deformation of the large section crossing-river tunnel during operation period were summarized and analyzed.A detailed analysis of the effect of tide and scour on the tunnel interface force and tunnel settlement were given.Data shows accumulations of both longitudinal settlement of tunnel segments and the earth pressure distribution around the tunnel lining under the loads of both traffic and tide which results in soil disturbance in the construction period.The settlement becomes stable after about six months.The substratum has a great influence on the longitudinal settlement of tunnel segments.The settlement of tunnel invert in sandy substratum is obviously affected by the tide of Qiantang River for short time, while slight changes appear in the deformation of tunnel diameter, stress of steel bar and earth pressure distribution.

Large section Crossing-river tunnel Sandy strata Monitoring during operation period Change of tide

Guanshui Liu Zongliang Li Shiming Wu Luqing Yu

Hangzhou Canal Tunnel Co.Ltd,Hangzhou,310000,P.R.China Hangzhou Qingchun Road Tunnel crossing River Co.Ltd,Hangzhou,310000,P.R.China Zhejiang Insigma Technology Co.Ltd,Hangzhou,310002,P.R.China School of Civil Engineering,Zhejiang University,Hangzhou,310058,P.R.China

国际会议

the 2012 International Conference on Vibration, Structural Engineering and Measurement (2012年振动、结构工程与测量国际会议(ICVSEM2012))

上海

英文

1517-1523

2012-10-19(万方平台首次上网日期,不代表论文的发表时间)