Design and Construction of Locking Steel Pile Cofferdam of South Tower Pile Cap for Taizhou Bridge

  South tower of Taizhou bridge is located in complex hydrogeological conditions,the amount of its excavation engineering is large.Combined with the successful application of locking steel pipe pile cofferdam in the south tower project of Taizhou Yangtze Highway Bridge,from comparison and demonstration, scheme design and construction, process monitoring to introduce locking steel pipe pile cofferdam in detail,using the classical method and the M method to design and calculation for supporting structure.Construction practice shows that the design and calculation of support structure is accurate,locking steel pipe pile fully played its function of sealing,it also has great rigidity, good integrity strong bending resistance and other advantages.The successfully application of this technology, promoting the technological progress of bridge foundation constructionthe in deep water or complex geological conditions,it provides a basis for the construction of similar projects in the future.

Locking steel pipe pile Deep pile Cofferdam design Construction

Zhenhong Wu Yong Xun Yanan Gan Chunhua Wang Ying Li Shichen Tang

School of Automobile and Traffic Engineering,Jiangsu University,Zhenjiang 212013,China School of Automobile and Traffic Engineering,Jiangsu University,Zhenjiang 212013,China;Yancheng Inst Yancheng Institute of Technology,Yancheng 224552,China Jiangsu Provingial Transportation Engineering Group CO.,LTD,Zhenjiang 212013,China Jiangsu Jiaotong College,Zhenjiang 212013,China

国际会议

the 2012 International Conference on Vibration, Structural Engineering and Measurement (2012年振动、结构工程与测量国际会议(ICVSEM2012))

上海

英文

1531-1534

2012-10-19(万方平台首次上网日期,不代表论文的发表时间)