会议专题

Red Clay Subgrade Settlement Calculation Methods in Ballastless Track Design on High-speed Railway

  Considering the characteristics of high-speed railway settlement requirement, i.e.high precision and strict control after construction, the subgrade settlement of the Wuhan-Guangzhou high-speed rail on the red clay area is calculated by ES method, e-lgp method, triaxial stress method, secant modulus method and field test method.In this essay, the accuracy of various calculation methods has been compared and corrected with the values from loading test.In this process, correction coefficients for various calculation methods have been obtained.

High-speed Railway Red Clay Subgrade Settlement Calculation Method Settlement Correction Factor

Xiao YANG Guo-lin YANG

School of Civil Engineering,Central South University,Changsha,410075,China;Department of Civil Engin School of Civil Engineering,Central South University,Changsha,410075,China

国际会议

the 2012 International Conference on Vibration, Structural Engineering and Measurement (2012年振动、结构工程与测量国际会议(ICVSEM2012))

上海

英文

1571-1576

2012-10-19(万方平台首次上网日期,不代表论文的发表时间)