会议专题

The Riverbed Evolution and its Influence on Channel in Tunaozi Reach after Three Gorges Water Storage

  Tunaozi reach is one of the three famous sediment depositing reach on the Sichuan section of Yangtze River.Its on the fluctuation backwater area when the Three Gorges Project is operated at the level of 135 m.According to the measured data before and after impoundment, this paper analyzes and calculates the sediment of the reach, and discusses the variation of silting and scouring of the reach after impoundment.Thus, this paper will have a study on the reason that silting and scouring lead to channel condition change.The result as follow: after impoundment, the bank-up water level of the reach has been head up 2 m during the flood season, sediment deposition becomes heavier than before impoundment; in post-flood season, the water level is 139m in November, it has been head up 7 m, compared with low water level in natural, current slowly flow further, the silt lack of enough scour in flood season, it leads to cumulative deposition.Until December 2005, thalweg plane position move left 200 m after impoundment.The maximum silting height of the thalweg longitudinal section is 30 m.The prime channel has been basically silted flat, year.Since the Three Gorges reservoir began to store water for three years, in low water level periods, ship tank is out of shallow, some timely dredging measure should be taken and make sure the smooth channel.

The three gorges reservoir Tunaozi reach Silting and scouring variation River Bed change Channel condition

Hua FU Xu He YaoChang Ma YunYun YANG

School of River and Ocean Engineering,Chongqing Jiaotong University,Chongqing,400074,P.R.China Bureau of Hydrology and Water Resources Survey of the Upper Yangtze River,Chongqing,400014,P.R.China

国际会议

the 2012 International Conference on Vibration, Structural Engineering and Measurement (2012年振动、结构工程与测量国际会议(ICVSEM2012))

上海

英文

2323-2327

2012-10-19(万方平台首次上网日期,不代表论文的发表时间)