会议专题

Optimization of steelmaking process for 200t converter

  To solve the problems appeared in the initial operation period of 200t BOF such as low heating velocity,high TFe content in final slag,severe lining erosion,etc,optimization of steelmaking process is carried out.Metallurgical effects are greatly improved after optimization:slag-forming time is shortened by 0.9min; oxygen consumption is lowered by 1.5 m3 per ton steel; carbon content of aimed molten iron is increased by 0.031% while oxygen activity of which is decreased by 206ppm.TFe content of BOF slag is reduced by 0.84% on average.

steelmaking lance position metallurgical effect

Chen Jun Li An-lin chen yong Liang Xin-teng Zeng Jian-hua

PanGang Group Research Institute Co., Ltd.State Key Laboratory of Vanadium and Titanium Resources Comprehensive Utilization, PanZhiHua 617000, Sichuan, china

国际会议

2012 International Conference on Chemical Engineering,Metallurgical Engineering and Metallic Materials(2012化工、冶金和金属材料国际会议(CMMM2012))

昆明

英文

1180-1183

2012-10-12(万方平台首次上网日期,不代表论文的发表时间)