Stable and High Productivity Operations of 3800m3 Blast Furnace in WISCO
This paper summarizes the operational practices of 3800m3 blast furnace in WISCO after its blowing in in 2009.Stable operations and high productivity have achieved through reasonable controlling raw materials,furnace profiles and optimizing routinely management etc.This largest BF of wisco has conducted a smooth performance after its commercial practices and resulted in a remarkable profit.
large sized blast furnace furnace profile intensified smelting
LU Long-wen LI Xiang-wei CHEN Wei-lin
Ironmaking Plant of Wuhan Iron and Steel Corporation