Disease Detection and Capacity Analysis of the Double Arch Bridge
This article take the Hainan Province Chengmai Datang bridge as an example,based on the scene test result and describes reason which its present main plant disease and forms.The union finite element analysis,compares the theoretical calculation and the dead load test result,makes the evaluation to its present supporting capacity condition.And according to the test result,will put forward the proposal to the reinforced concrete double-curvature arch bridge in the future operation management and the reinforcement.
the double arch bridge disease dead load experiment supporting capacity condition
Yaxun Yang Zhikui Yang Chao Qiao
Key Laboratory for Bridge and Tunnel of Shaanxi Province, Changan University, Xian,Shaanxi,China, 710064
国际会议
西安
英文
446-449
2012-08-24(万方平台首次上网日期,不代表论文的发表时间)