会议专题

Debug and Development of ADAM 6022 Communication in industry automation control

  Automatic communication problem was always difficult for installation of industry supervision control system.‘3Stages debug strategy was proposed and discussed for Adam 6022 in detail in this paper,which was composed by three steps which included address setup,port search and Graphical Condition Logic (GCL) test; and this strategy was proved effective after practical industry application.

ADAM 6022 Configuration Communication Debug

Yuchun Li Xiaowei Liu Juan Kang Fan Gao

Hunan Provincial Key Laboratory of Materials Protection for Electric Power and Transportation,School of Chemistry & Boilogical Engineering, Changsha University of Science & Technology, 960.Wanjiali South Road, Changsha City, 410114, China

国际会议

2012 2nd international Conference on Materials Science and Information Technology(2012第二届材料科学与信息技术国际会议)(MSIT2012)

西安

英文

531-534

2012-08-24(万方平台首次上网日期,不代表论文的发表时间)