Research on Optimize Scheduling Model and Heuristic Algorithm Based on Capacity Balance
To optimize scheduling pertaining to two production units and many tasks in flexible production,a dynamic scheduling model was proposed considering capacity balance.Each production unit was modeled as a kind of container whose capacity symbolized the container capacity.The capacity was divided as planned and spared parts.Joining spared capacities in two units,the state-to-art dynamic scheduling rules were created according to hydro-mechanical theory.A practical heuristic algorithm was developed for this model.The model was tested as feasible and effective in a case study conducted at an actual business.
optimize scheduling heuristic algorithm capacity balance
XUE Dongjuan
School of Mechanical Engineering, Dalian Ocean University,Dalian, China
国际会议
西安
英文
1573-1577
2012-08-24(万方平台首次上网日期,不代表论文的发表时间)