A Primer to Applying Real Time Dispatching in Semiconductor Test Operations
Balancing the capacity and effective use of tester equipment to fulfill customer orders in both wafer test and final test is an ongoing need.Challenges are growing in the coverage of die circuitry and probing,as well as validating chip performance against specification.Validation at the die test operation using the same tester equipment places added demand on manufacturing effectiveness.This paper describes how real-time dispatching in the wafer and die test improves overall factory performance at these test operations.
Ng Yuh Lin
Applied Materials South East Asia Pte Ltd 8 Upper Changi Road North,Singapore 506906
国际会议
桂林
英文
1027-1029
2012-08-13(万方平台首次上网日期,不代表论文的发表时间)