Study and application on cutting technology of underground drifting blasting
Because of the weak borehole sealing and inadequate use of the initial free face,the higher investment and unsatisfactory blasting effect still exist in the mine tunnel excavation blasting.In order to improve the blasting effect of drifting,on the basis of a discussion on blasting mechanisms,the author take Xinhong Mine fine sandstone roadway for example,select reasonable blasting parameters and determine the proper cutting form.So that the efficiencies of blasting and excavation have been increased greatly,and good economic results has been achieved.
Drifting Blasting parameter Cutting
Xiantang Zhang Peng Zou Hongmin Zhou Hongli Wang
Shandong Provincial Key Laboratory of Civil Engineering Disaster Prevention and Mitigation,Shandong University of Science and Technology, Qingdao, Shandong 266590, China
国际会议
太原
英文
1002-1006
2012-06-23(万方平台首次上网日期,不代表论文的发表时间)