The Finite Element Analysis of Static Strength of Workover Derrick by Truck
Conventionally,the influence of guy wire and wind load on derrick was often ignored in the static strength analysis of derrick of truck-mounted workover rig,it does not accord with the actual working conditions.This paper made the finite element analysis for one derrick of Truck-mounted workover rig through ABAQUS software.The author derive the maximum static hock load which derrick can bear,and reasonably shorten projective radius of guy wire,under different static hock load and wind load,determining the weakest position of derrick.
Derrick Finite Element Analysis Stress Static hock load Guy wire Optimization
Zhi Liu Ke Yao Di Wu Dong Li Jiuyan Fu Jinxia WU
Xian Research Institute,China Coal Technology & Engineering Group Corp,Xi,an710077,China China University of Petroleum(Beijing),Department of Materials Science and Engineering,Beijing 10224 SINOPEC Research Institute of Petroleum Engineering,De zhou,Shandong253005,China
国际会议
西安
英文
918-922
2012-06-12(万方平台首次上网日期,不代表论文的发表时间)