Application of Pre-grouting Technique in Yellow River Crossing Tunnel in Eastern Route of South to North Water Transfer Project
The yellow river crossing tunnel runs through limestone at a depth of about 70m below the level of yellow river.Since the river water,phreatic pore water in loose Quaternary deposits and karst/fissure water in limestone communicates with each other,pre-grouting technique has to be employed before drilling and blasting excavation of the tunnel.
Tunnel Pre-grouting Permeability rate Watertight curtain
Xiaoyan Wang Shiwei Duan Xiane Xu Haoliang Wang