Assembly Model Based on Dynamic Transition Graph for Satellite General Assembly Process Planning
Beginning with the disassembly of the semi-finished modules,the general assembly process of satellites is quite different from that of other mechanical products.This kind of disassembly-reassembly process cannot be solved by the widely used cut-set theory that only deals with linear problems,thus an approach called Dynamic Transition Graph (DTG) is proposed to solve this nonlinear assembly sequence planning problem.By analyzing and verifying possible assembly statuses hierarchically through matrix operations,a DTG is produced on the basis of Liaison Graph,where the DTG includes all the geometric feasible assembly sequences for the general assembly of satellite.Finally,the effectiveness of this method is verified by an example.
Assembly process planning Liaison graph Cut sets
Gang Sun Jianfeng Yu Yuan Li
The Institute of Beijing Satellite Environment Engineering, Beijing, 100094, China The Key Laboratory of Contemporary Design and Integrated Manufacturing Technology, Ministry of Educa
国际会议
厦门
英文
1542-1545
2012-01-04(万方平台首次上网日期,不代表论文的发表时间)