Development Scenario and Riser Selection for West Africas Target Oil Field
Developing deepwater oil and gas resource is the trend of oil industry development.It is important to select a proper development scenario and riser system which works as a key tool to connect subsea equipment and surface body in a deepwater project.Based on the West Africas deepwater target field CNOOC owned,this paper designs a detailed development scenario-FPSO +SPS +Shuttle tanker according to the following factors:well,reservoir layout,environment,floaters availability,commercial considerations.Floater and riser selection interact with each other.Considering the development scenario,a basic method for selecting a proper riser system is presented.As a result,FSHR is selected from existing risers based on technology,reliability,risk and cost.
deepwater field development riser scenario SCR FSHR West Africas deepwater field
Junpeng Liu Xiaolan Luo Menglan Duan Kai Tian Wei Feng
Offshore Oil/Gas Research Center, China University of Petroleum, Beijing, China, 102249 CNOOC Research Center,, Beijing, China,100027
国际会议
厦门
英文
1773-1776
2012-01-04(万方平台首次上网日期,不代表论文的发表时间)