会议专题

Research on Risk Assessment of Reservoir by AHP-Fuzzy Comprehensive Analysis Method

  Because of the fuzziness and uncertainty of risk factors in the risk management,using fuzzy comprehensive evaluation model for research.The model not only identifies the main risk factors of the dam,spillway,and water facility,but also quantifies the influence weight by risk factors on dangerous reservoir.The affiliate degrees of risk factors on risk level can be get on the basis of membership function.So the final overall risk level of the dam,spillway,and water facility is able to compare.It will be set the priority to reinforcement measures for dangerous reservoir.

Dangerous reservoir Risk assessment AHP-Fuzzy comprehensive evaluation

Lingang Tian Zhi Liu

College of water conservancy, North China University of Water Resources and Electric Power, Henan,China

国际会议

the 2012 International Conference on Frontiers of Advanced Materials and Engineering Technology (2012年先进材料与工程技术国际会议(FAMET 2012))

厦门

英文

1974-1978

2012-01-04(万方平台首次上网日期,不代表论文的发表时间)